Hot Sale Boilers
GET 20%OFF √
Certification:ASME、ISO9001、CE、ISO、BV、CCC
Available fuel:Nature gas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.
Available industries:Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.
E-mail:[email protected]
Please email or call us for your inquiry
Aug 06, 2018 · Zetec Inc. will host a one-hour webinar on the latest phased array ultrasound technology (UT) and how it can easily scale to meet changing Oil & Gas operational and inspection needs, while delivering fast and accurate nondestructive testing (NDT) results. - An easy-to-use solution for the inspection of boiler tubes
Get price35 fit up (header to tube) drawing ‐ report h sw ‐ 36 welding inspection drawing, wps/ pqr ‐ report h w ‐ 37 non‐destructive examination nde procedure ‐ report h sw ‐ 38 final dimensional / visual inspection international std. ‐ report h h ‐ headers finned tubes tube bundle assembly with casing 3
Get priceVisual Inspection and Monitoring of critical weld repairs and alterations. Power Boiler Inspections, High Energy Piping and FAC Surveys. PA/AUT for detection of HIC, SOHIC, Blistering and HTHA. Phased Array UT of Boiler Tube and Piping welds. General Piping, Vessels and Tank Inspections. API QUTE certified
Get priceFriction Stir Weld Inspection 2 years ago 612 views Solution: Boiler Tube Weld In 2 years ago 2,011 views Solution: Turbine Blade Inspe 2 years ago 1,030 views Solution: High Temperature Hy 2 years ago 1,609 views Solution: Large Rotor Shaft I
Get priceThis content covers all necessary stages in the production of the water tube boilers from the examination of the material, fabrication, welding inspection, dimensional inspection, NDE, hydrostatic testing to the final inspection, preservation and packing to despatch to the site.. You need to take this point in account this article is written for a typical Water Tube Boiler and …
Get priceBoiler Tube Weld Inspection Inspection Challenges. When inspecting boiler tube welds, outage time and resources are key inspection challenges. The industry requires a rapid volumetric non-destructive testing (NDT) technique to minimize these challenges. Zetec Products. Zetec offers the optimal solution for this type of inspection challenge
Get priceVisual Inspection and Monitoring of critical weld repairs and alterations. Power Boiler Inspections, High Energy Piping and FAC Surveys. PA/AUT for detection of HIC, SOHIC, Blistering and HTHA. Phased Array UT of Boiler Tube and Piping welds. General Piping, Vessels and Tank Inspections. API QUTE certified
Get priceThe handbook presents examples of common failure mechanisms in a variety of boilers including power boilers, recovery boilers, and Heat Recovery Steam Generators (HRSGs). Visual examination may help the equipment operator decide whether further metallurgical examination and root cause analysis is warranted. The only sure way to determine a failure mechanisms …
Get priceThe following brief description of the steam locomotive boiler will acquaint inspectors with its construction and summarize the inspection procedure. For repair information and additional construction illustrations, the new NBIC Appendix H, Steam Locomotive Fire Tube Boiler Repair is recommended. The common steam locomotive boiler is a
Get priceDec 28, 2017 · About Press Copyright Contact us Creators Advertise Developers Terms Privacy Policy & Safety How YouTube works Test new features Press Copyright Contact us Creators
Get priceThe regulation is similar to the one for the boiler. With the above explanation, your inspection and test plan (ITP) for the water tube boiler needs to meet the requirements of ASME Code Section I. The water tube boiler is made from several components such as the HP Drum, finned Tubes, Headers, Tube Bundle, Stack, Damper, Silencer, Deaerator, etc.
Get priceand built many systems for PA-TOFD pipe and tube inspection systems. For this contract, a compact Cobra scanner from Mistras Group was used. The scanner is moved manually and incorporates an encoder for PA UT evaluations of boiler tubes. It is a robust device and can be used on water wall weld inspection around tubes up to 4 inches in diameter.
Get priceWelding process and procedures on steam boilers must be taken seriously since any welding defects can lead to serious problems. Here are some fundamental guidelines for boiler repair by welding. I cannot cover all aspects of repair in a short article but I will try my best to help you learn a little bit more about this topic in simple technical terms.
Get price35 fit up (header to tube) drawing ‐ report h sw ‐ 36 welding inspection drawing, wps/ pqr ‐ report h w ‐ 37 non‐destructive examination nde procedure ‐ report h sw ‐ 38 final dimensional / visual inspection international std. ‐ report h h ‐ headers finned tubes tube bundle assembly with casing 3
Get priceVideo – Zetec Success Story: Phased Array Ultrasound Inspection of High Speed Train Wheel Rim & Spoke; Video – Zetec Time Reversal Technique for Composite Inspections; Article – Zetec Application Note: Boiler Tube Weld Inspection; Article – Zetec Application Note: Countersink Fastener Inspection
Get priceAug 17, 2020 · Abe got with Xavier a former student of SCWA to to show you how they weld a tube panel! Here is some boilermaker welding coming at you! They will showcase th
Get priceTMQC-Boiler Tube Weld Inspection 2014.pdf. TMQC-Boiler Tube Weld Inspection 2014.pdf. Sign In. Details
Get priceAug 06, 2018 · Zetec Inc. will host a one-hour webinar on the latest phased array ultrasound technology (UT) and how it can easily scale to meet changing Oil & Gas operational and inspection needs, while delivering fast and accurate nondestructive testing (NDT) results. - An easy-to-use solution for the inspection of boiler tubes
Get priceSolutions: The primary method employed to combat furnace wall boiler tube corrosion is the use of high-Ni/high-Cr weld overlays on tubes in the locations that are experiencing the worst corrosion. Corrosion-resistant thermal sprays may also be considered for this application.
Get priceGE's PALM Flat Scanner for General UT Weld Inspection . Call For Price 1 888 576 7756 DA312 Boiler Tube Probe . CA$1,054.98. Add to Cart. Add Wishlist . DA512 Small Diameter Fingertip Probe Zetec's Topaz 32, Phased Array UT Flaw Detector AGFA Radiographic Film
Get priceMar 12, 2020 · Boiler tubes are a key component of steam power and as such are subjected to terrible force. This means that boiler tube weld inspection is crucial to keeping mission-critical operations safe. Over time, phased array ultrasonic testing (PAUT) has emerged as one of the best means of non-destructive testing (NDT) of boiler tubes.
Get priceNondestructive Testing of Boiler Tubes Perhaps the best method of boiler tube inspection is Phased Array Ultrasonic Testing (PAUT), paired with Time of Flight Diffraction (TOFD). With a single system, engineers and inspectors have the coverage they require to ensure consistent operations. PAUT pulses through pipes with computer-timed calculations.
Get priceAug 20, 2021 · Boiler tubes are a key component of steam power and as such are subjected to terrible force. This means that boiler tube weld inspection is crucial to keeping mission-critical operations safe. Over time, phased array ultrasonic testing (PAUT) has emerged as one of the best means of non-destructive testing (NDT) of boiler tubes.
Get priceEddy Current Testing of Chiller Tubes: The Long-Term Value
Get priceEddy Current Surface Inspection. Horizon Testing Inc. is pleased to offer our clients the option of Eddy Current Surface Inspection for the following applications: gear inspection, boiler composite tube inspection, weld inspection for surface defects, and crack detection on …
Get priceBoiler and pressure vessel inspections require meticulous, code-compliant work. You can't trade off speed for a thorough job. "Trust is one of the pillars of our business, and customers trust us to deliver technical advice and test results that are reliable and accurate," said Carlos Oliva, technical and quality manager at Eddytronic, a Santiago, Chile, company that conducts a wide range
Get pricePhased Array UT, Boiler Tube, Sector Scan, Weld Inspection, Tube Inspection, Low Profile Tube Inspection Abstract. In Power industry, boiler tube weld quality and integrity are critical to safety in wide range of structures. Typical boiler tubes thickness range varies between 4 mm to 12 mm and diameter will be between 38 mm to 118 mm. Welding
Get priceSep 10, 2020 · Water Side Boiler Inspections. As water treatment experts, the portion of boiler inspection we are invested in is the water side of a boiler. Here is what to expect. Inspections include a look and/or climbing into the mud drum; sometimes Chemtex reps take photos inside the boiler and make marks showing the inspection date. Water Tube Boiler
Get priceMore info. EKOFLEX DOUBLE scanner was designed to inspect small diameter pipe/tube welds and has a low profile height to operate between obstructions such as for boiler tube inspection. Users can configure the Revolver for a single side phased array inspection or dual for complete weld coverage. The encoder used is rated to IP68 and is designed
Get priceAn easy to use solution for the inspection of boiler tubes. Featuring the Circ-it scanner combined with Zetec low profile PA probes A flexible and powerful solution for the inspection of long seam welds. Featuring the Weld Crawler …
Get priceBoiler Tube Weld Inspection Application Note .zetec.com Inspection Challenges When inspecting boiler tube welds, outage time and resources are key inspection challenges. The industry requires a rapid volumetric non-destructive testing (NDT) technique to …
Get priceInspection After Damage. Sometimes, you can't prevent the damage that occurs to boiler tubes and heat exchanges. One of the biggest culprits of boiler tubes and heat exchange failure is caused by overheating. When failures occurred due to overheating, careful inspection with your borescope is vital to prevent the escalation of the issue.
Get priceFig. 4 shows the tube holes in the flat head of a three-pass firetube boiler. As with the watertube boiler, the heads are fastened to the shell by welding. The tube holes in a watertube boiler are located in the drum rather than in the head and Fig. 5 illustrates the assembly of tubes to the drilled holes. Figure 5 Tube Holes in WatertubeBoiler
Get priceBoiler tube material has been deformed due to very heavy deposits on the inside of the tube that insulate the tube metal from the boiler water and cause overheating. Issue Type: Bulging » Deformation Locations: Waterwall Boiler Type: Power Industry: Pulp and Paper Mechanism: Long-term Overheat Download a PDF Bulging tube adjacent to field weld
Get priceMar 06, 2019 · Boiler tube welds require a rapid volumetric inspection method. Traditionally, radiography (RT) is used, but this technology has several drawbacks. RT is insensitive to mis-oriented planar defects, it does not provide immediate feedback to the welders, and is disruptive to other activities.
Get priceBoiler tube material has been deformed due to very heavy deposits on the inside of the tube that insulate the tube metal from the boiler water and cause overheating. Issue Type: Bulging » Deformation Locations: Waterwall Boiler Type: Power Industry: Pulp and Paper Mechanism: Long-term Overheat Download a PDF Bulging tube adjacent to field weld
Get priceAug 20, 2021 · Boiler tubes are a key component of steam power and as such are subjected to terrible force. This means that boiler tube weld inspection is crucial to keeping mission-critical operations safe. Over time, phased array ultrasonic testing (PAUT) has emerged as one of the best means of non-destructive testing (NDT) of boiler tubes.
Get priceand built many systems for PA-TOFD pipe and tube inspection systems. For this contract, a compact Cobra scanner from Mistras Group was used. The scanner is moved manually and incorporates an encoder for PA UT evaluations of boiler tubes. It is a robust device and can be used on water wall weld inspection around tubes up to 4 inches in diameter.
Get priceA certificate holder is preparing to weld several hundred circumferential joints in power boiler tubes. ASME Section I requires these welds to be full penetration, but due to the diameter, thickness, and location in the boiler, radiography of the …
Get priceSpecific equipment for boiler tube inspection. Permits inspection of boilers instead of spot checking at up to 15cm/s of scanning speed. Ultrasonic EMAT technique provides accurate thickness readings with minimum surface preparation. Only system capable of measuring remaining wall thickness on heavily corroded tubes.
Get price